From vision to reality

Webasto

The “Webasto Facility Warehouse” is a project situated in Arad County, Zimandu Nou Industrial Area. Start of the works was in June 2014 for roads works and August 2014 for warehouse building.

The plot it’s a Greenfield in surface of 114,532sqm. The planning is building of roads, external works and the warehouse with office and a technical areas with 1 floor.

 

Scope of Works

Phase 1: Roads – Building of roads and external networks aprox. 12,350 sqm

Phase 2: Warehouse facility – Building of a warehouse facility

 

BA3/01 – Production

The structure is realized from precast concrete with individual foundations.

The envelope is realized with steel cassettes with thermal insulation protected by steel sheets.

The roof is realized from trapezoidal sheets with thermal insulation and pvc membrane.

The floor is realized from fiber reinforced concrete 20cm thickness.

 

BA3/03 – Storage

The structure is realized from precast concrete with individual foundations.

The envelope is realized with steel cassettes with thermal insulation protected by steel sheets.

The roof is realized from trapezoidal sheets with thermal insulation and pvc membrane.

The floor is realized from fiber reinforced concrete 20cm thickness.

 

BA3/06 – Office area

The structure is realized from precast concrete with individual foundations. It has 2 levels separated by an interim concrete slab.

There are 2 entrances with 2 staircase separated by other area by brick walls and fire resistant doors.

The envelope is realized with steel cassettes with thermal insulation protected by steel sheets.

The roof is realized from trapezoidal sheets with thermal insulation and pvc membrane.

The floor is realized from reinforced concrete 15 cm thickness.

The windows are from aluminum and pvc.

The internal walls are done either from brick or from gypsum.

The floor finishes are tiles and carpet.

 

BA3/07,08 – Social and technical areas

The structure is realized from precast concrete with individual foundations. It has 2 levels separated by an interim concrete slab.

There is 1 entrance with 1 staircase separated by other area by brick walls and fire resistant doors.

The envelope is realized with steel cassettes with thermal insulation protected by steel sheets.

The roof is realized from trapezoidal sheets with thermal insulation and pvc membrane.

The floor is realized from reinforced concrete 15 cm thickness.

The windows are from aluminum and pvc.

The internal walls are done either from brick or from gypsum.

The floor finishes are tiles and concrete.

 

The MEP works are performed by other contractor